Planning · 3 min read
Preparing your property for the drilling truck
A practical guide to the decisions that happen before drilling: access, water needs, siting and the questions worth asking.

Start with the water you need
Describe the intended use of the water, the number of people or activities it will support, and whether you already have tanks or plumbing. A household supply is different from a system serving irrigation or a commercial operation.
Share any information you have about an existing borehole, nearby drilling or previous water problems. Those details can guide questions, but only investigation and testing at your site can establish its own conditions.
Look at access and the working area
Check the route from the road to the proposed drilling area. Gates, sharp turns, soft ground and low branches may affect access for a heavy vehicle. Send photographs of the entrance and working area when requesting an assessment.
Point out known buried services, overhead power lines, septic systems and other features the team needs to consider. Ask about safe separation requirements and any permissions that apply to your property.
Ask what the quotation includes
Discuss siting, drilling, casing, development and testing separately from the pump, electrical work, tanks and plumbing. Ask how additional depth or unexpected conditions are handled so the scope is clear before work starts.
Keep the agreed scope and available borehole records for future maintenance. When you contact Tenland, include your location, intended water use and any access concerns — that gives the conversation a useful starting point.
